Development Schemes | Downloadable Form | Planning Division | RTI
 
 About us Master Plan Tender Notices Acts / Rules Photo Gallery Related Links Contact us Notice Notifications  
 
Home
What's New
1. Transport Nagar
  This project is proposed for parking of goods and other transport vehicles which otherwise remain parked at various points in BBN area and create road blocks besides proving a hazard for pedestrians. The Transport Nagar would have provision for work-shops for transport vehicles that would reduce the hazardous parking before workshops now functioning at various places in the area. Following shall be the main facilities proposed to be covered under this scheme: 

·                     Parking facility.

·                     Ware- housing facility.

·                     Service stations.

·                     Weigh bridge.

·                     Filling stations.

·                     Commercial areas.

  Task of preparing the prefeasibilty report of this project has been assigned to ILFS. A government land of roughly 715 bighas has been identified for this project. A study to undertake site suitability is being done.
   
2. Sewage Treatment Plant for Baddi- Barotiwala area
  A Common Effluent Treatment Plant and Sewerage Treatment Plant is envisaged for BBN area. The task of development of project on BOT basis for Baddi Barotiwala core area has been assigned to ICRA macs. The feasibility of combining common effluent treatment plant after the primary treatment of effluents within the industries with the sewerage project shall also be studied. Technical consultants are being hired for preparation of technical DPR.

            In the mean time IPH department has designed and estimated the sewerage network pipelines along the stretch of road about 4.2 Km long  on Baddi-Sai Road which is the main commercial centre of Baddi Town The Project cost is  Rs. 5.7 crore and it shall be shortly taken up for execution.  

   
3. Surface and Storm Water Drainage System for Baddi
  Due to inadequate provision of this system in Baddi Barotiwala area, the waste water and storm water collects on the road. This water blockage damages the roads and also causes public nuisance and public health problem. There is a plan to redesign the storm water drainage system in Baddi Barotiwala core area and to shift to under ground surface/storm water drainage system where ever feasible. The process to engage technical consultant for preparing this is underway and short listing of firms has been done after inviting E.O.I. With the provision of this system not only the roads can be maintained easily but sanitation conditions could be improved.
   
4. Club house cum convention centre at Baddi
 

BBNDA plans to develop a modern club house cum convention centre in Baddi having latest facilities for exhibitions, conferences, recreation, games, leisure etc. The project shall be undertaken on a public private partnership mode. The process to hire architects/ consultancy firms for detailed drawings/building plans is underway.

 

 

All Rights Reserved, Best Viewed under 1024 x 768 Resolution